The shooting schedule, as prepared by Production Manager Ron Fry on 4th December 1974. The 11-day shoot would start on Thursday 5th December, and would require a number of special requirements including the foam effects, lighting effects, and camera effects.
GROUP PRODUCTIONS LIMITED |
"SPACE 1999" TELEVISION SERIES |
|
SHOOTING SCHEDULE No. 1 "SPACE BRAIN" EPISODE 20 DIRECTOR: CHARLES CRICHTON |
||
Issued: 5th. December 1974 |
GROUP PRODUCTIONS LIMITED | "SPACE 1999" TELEVISION SERIES. PAGE 1 |
SHOOTING SCHEDULE No. 1 - " SPACE BRAIN " (EPISODE 20)
DATE | STAGE | SET | SCENE NOS. | PAGES | CHARACTERS | ESSENTIAL REQUIREMENTS |
THURSDAY 5TH DECEMBER 1974 |
L | INT. MAIN MISSION/KOENIG'S OFFICE TV Link:- (Medical Section) |
18.26.28.39. 48.65A.70.A. F.H.L. |
7 | KOENIG HELENA BERGMAN MORROW CARTER SANDRA KANO TANYA M/M OPERATIVES (DR.MATHIAS) |
Live TV link to sets. Hieroglyphics on monitors. Matte screen. L/Cameraman: Light change on Sc.'L'. |
FRIDAY 6TH DECEMBER 1974 |
L | INT. MAIN MISSION/KOENIG'S OFFICE TV Link:- (Medical section) |
5.7.9.11A.13. 75. |
4 1/2 | KOENIG HELENA BERGMAN MORROW CARTER SANDRA KANO KELLY MELITA TANYA DR.MATHIAS M/M OPERATIVES |
Live TV link to sets. Matte screen. SFX: Rain on window fx. Camera Dept & SFX: Set to judder fx.. |
SATURDAY SUNDAY |
) ) ) ) ) |
NO SHOOTING |
GROUP PRODUCTIONS LIMITED | "SPACE 1999" TELEVISION SERIES. PAGE 2 |
SHOOTING SCHEDULE No. 1 - " SPACE BRAIN " (EPISODE 20)
DATE | STAGE | SET | SCENE NOS. | PAGES | CHARACTERS | ESSENTIAL REQUIREMENTS |
MONDAY 9TH DECEMBER 1974 |
L | INT. MAIN MISSION/KOENIG'S OFFICE |
77.82.85.87.90. 94.100.102. |
4 7/8 | KOENIG HELENA BERGMAN MORROW CARTER SANDRA KANO KELLY MELITA DR.MATHIAS TANYA M/M OPERATIVES |
Live TV link to sets. Matte screen. |
TUESDAY 10TH DECEMBER 1974 |
L | INT. MAIN MISSION/KOENIG'S OFFICE TV Link:- (Medical section) |
104.112.113.117. 123.125.127.62. Burn-ins for Scs. F.H.132. |
4 1/4 | KOENIG HELENA BERGMAN MORROW CARTER SANDRA KANO DR.MATHIAS TANYA M/M OPERATIVES |
Live TV link to sets. SFX: Foam fx to build up outside and inside Main Mission.. L/Cameraman: Light change on Sc. 113. Camera Dept: Set to vibrate fx. Wardrobe Dept: Space suits req. Art Dept: Foam to be cleared up for Sc.132. |
WEDNESDAY 11TH DECEMBER 1974 |
L | INT. MAIN MISSION/KOENIG'S OFFICE |
133. | 1 1/4 | KOENIG HELENA BERGMAN MORROW CARTER SANDRA KANO TANYA M/M OPERATIVES |
Live TV link to sets. SFX: Some foam fx req.. Wardrobe Dept: Space suits req. |
NORTH TUNNEL |
INT. EAGLE COMMAND & PASSENGER MODULES |
K.3.6.11.20.25. 27.33.40.44. 68.76.79.81.84. 86.91. |
4 1/2 | KOENIG CARTER COUSTEAU KELLY (BERGMAN) WAYLAND (MORROW) |
Hieroglyphics on monitors in Eagle. L/Cameraman: Light fx for Sc. 33. Camera Dept: Sea Head req. |
GROUP PRODUCTIONS LIMITED | "SPACE 1999" TELEVISION SERIES. PAGE 3 |
SHOOTING SCHEDULE No. 1 - " SPACE BRAIN " (EPISODE 20)
DATE | STAGE | SET | SCENE NOS. | PAGES | CHARACTERS | ESSENTIAL REQUIREMENTS |
THURSDAY 12TH DECEMBER 1974 |
NORTH TUNNEL |
INT. EAGLE PASSENGER & COMMAND MODULES |
21.31.46.49. 51.64.69.88. |
3 3/8 | KOENIG CARTER KELLY Stunt Doubles: Carter Kelly |
Live TV link to sets. SFX: Kirby wire required for both sets. Camera Dept: Sea head req High speed camera req. L/Cameraman: Various lighting fx in space. |
NORTH TUNNEL |
EXT. SPACE | 24.32.37.41.45. 47. |
1 1/2 | KELLY CARTER Stunt Doubles: Kelly Carter |
||
FRIDAY 13TH DECEMBER 1974 |
L | INT. MEDICAL CENTRE/ INTENSIVE CARE UNIT TV Link:- (Main Mission) |
D.53pt. | 5 | KOENIG HELENA BERGMAN DR.MATHIAS KELLY MELITA NURSES 'A''B''C' PATIENT (KANO) Stunt Doubles: Koenig;Helena; Bergman;Kelly; Dr.Mathias. |
Live TV link to sets. Hieroglyphics on monitor. Computer readout on monitor. |
SATURDAY SUNDAY |
) ) ) ) ) |
NO SHOOTING |
GROUP PRODUCTIONS LIMITED | "SPACE 1999" TELEVISION SERIES. PAGE 4 |
SHOOTING SCHEDULE No. 1 - " SPACE BRAIN " (EPISODE 20)
DATE | STAGE | SET | SCENE NOS. | PAGES | CHARACTERS | ESSENTIAL REQUIREMENTS |
MONDAY 16TH DECEMBER 1974 |
L | INT. MEDICAL CENTRE/ INTENSIVE CARE UNIT TV Link:- (Main Mission) (Computer Room) |
Comp.53.65.71.73pt. | 5 | KOENIG HELENA BERGMAN Dr.MATHIAS KELLY MELITA NURSES 'A''B''C' (KANO) |
Live TV link to sets. |
TUESDAY 17TH DECEMBER 1974 |
L | INT. MEDICAL CENTRE/ INTENSIVE CARE UNIT TV Link:- (Main Mission) (Computer Room) |
Comp.73.74pt.106. 110.115.121. |
4 3/8 | KOENIG HELENA BERGMAN DR.MATHIAS KELLY MELITA NURSE 'A' (MORROW) (KANO) |
Live TV link to sets. SFX: Foam fx inside & outside Medical Centre. Window to burst & foam pour in. CAMERA Dept: High speed camera required. L/Cameraman: Various lighting fx for Scs.74pt (Space Brain seq.) |
WEDNESDAY 18TH DECEMBER 1974 |
L | INT. MELITA'S QUARTERS. | C.16. | 1 | KOENIG DR.MATHIAS KELLY MELITA SECURITY MEN 'A''B' |
Live TV link to sets. Hieroglyphics on monitors. SFX: Foam fx inside & outside corridor and at window of Technical Section. |
M | INT. CORRIDORS | B.E.59.60.98.109. 114.116.120. |
2 1/4 | KOENIG HELENA BERGMAN DR.MATHIAS KELLY SECURITY MEN 'A''B' OTHER ALPHANS |
||
M | INT.TECHNICAL SECTION TV Link:- (Main Mission) |
23pt. | 1 1/2 | KOENIG HELENA BERGMAN DR.MATHIAS (MORROW) TECHNICIANS 'A''B' |
GROUP PRODUCTIONS LIMITED | "SPACE 1999" TELEVISION SERIES. PAGE 5 |
SHOOTING SCHEDULE No. 1 - " SPACE BRAIN " (EPISODE 20)
DATE | STAGE | SET | SCENE NOS. | PAGES | CHARACTERS | ESSENTIAL REQUIREMENTS |
THURSDAY 19TH DECEMBER 1974 |
M | INT.TECHNICAL SECTION TV Link:- (Main Mission) |
Comp 23.108 | 1/2 | KOENIG HELENA BERGMAN TECHNICIANS 'A''B' (MORROW) |
Live TV link to sets. Computer readout on monitor. |
M | INT.COMPUTER ROOM & CORRIDOR TV Link:- (Medical Centre) |
54.55.56.57.58. 70A.72. |
4 1/8 | KOENIG DR.MATHIAS KANO KELLY SECURITY MEN 'A''B' Stunt Doubles: Koenig Kelly |
Editor Note:
1) Standard series opening for Sc.No.15.
2) Stock shots required for Scs.J.8.16.63.67.80.87.plus 74pt (Space Brain sequence)
SPECIAL EFFECTS SET & SCENE LIST:
EXT. SPACE SKY: | 0.1.2.4.10.19.22.34.36.43.50.52.66.78.83.92.95.122.126.128.129.130. Plus (Burn-ins for Sc.Nos: 70.75.77.82.85.87.) |
EXT. ALPHA: | 12.14.89.93.103.105.107.111.118.124.131. |
EXT.MOON SURFACE: | 99.101 |
INT.MAINTENANCE: | 119. |
SPACE BRAIN SEQUENCE | 74pt. |
Ron Fry,
PRODUCTION MANAGER
Copyright Martin Willey. Thanks to Mike Prendergast