The Catacombs The Production Guide
Script To Screen: Dorzak
by Martin Willey

Script To Screen


Filming began on Tuesday 2nd November 1976, and lasted 14 days later on Friday 19th November, three days over schedule. This is the shooting schedule, published shortly before filming (and before script amendments issued on 3rd November).

As usual, initial shots were done on the standing sets on stage L for 6 days. On Tuesday 9th they to the specially constructed sets of the Docking Port and Croton ship. On most episodes these were built on stage M, but during this episode these were being used for the Walt Disney film One Of Our Dinosaurs Is Missing (Devil's Planet sets were on stage B), so the North Tunnel stage was used instead.

By Monday 8th they were slipping behind schedule; shots in the Tech Lab and Detention Room fell to Tuesday 9th. The docking port scenes (due on 9th and 10th) were then pushed back to the end, moving straight into the Croton ship.

They finally finished the Croton ship scenes on the 17th, one day late, but then they had to do the docking port shots. Together with Croton reshoots, these final shots anothe 3 days, until 19th, after 14 days of filming, and 3 days late.

GERRY ANDERSON PRODUCTIONS LTD.
"SPACE 1999" SERIES II
"DORZAK" EPISODE 21
(HELENA DOUBLE-UP SCRIPT)

DIRECTOR: VAL GUEST

SHOOTING SCHEDULE NO. 1

Issued on 28th October, 1976.
Based on printed script dated
4th August, 1976, and subject
to script revisions.

GERRY ANDERSON PRODUCTIONS LTD. "SPACE 1999" - SERIES II
"DORZAK"
(HELENA DOUBLE-UP SCRIPT)
EPISODE 21
DIRECTOR: VAL GUEST
SHOOTING SCHEDULE NO. 1 Issued 28:10:76
DATE SET STAGE SCENE NOS. CHARACTERS
Tue
2nd
Nov.
INT. COMMAND CENTER

Special Req.
Practical TV Monitors

L 2: 4: 6: 8: 10:
12: 15: 17: 51:
54: 66

(5 pages)

HELENA
TONY
MAYA
ALAN
SAHALA
YASKO
DORZAK
MAYA/SAHALA
DR. VINCENT
1st OPERATIVE ?
OPERATIVES
V.O. Sc.8
INT. CORRIDOR -
COMMAND CENTER

Special Req.
Practical TV Monitors

L 50
(3/8 page)
HELENA
MAYA/SAHALA
TONY
ALPHANS ()
Wed
3rd
Nov.
INT. CORRIDOR OUTSIDE
TRAVEL TUBE
L 19: 52

(1 page)

HELENA
MAYA
SAHALA
ALAN
2 SECURITY GUARDS
Sc.19
2 SECURITY GUARDS
Sc.52
2 MEDICAL ATTDTS.
INT. TRAVEL TUBE L 18
(1 page)
HELENA
SAHALA
YESTA
2 MEDICAL ATTDTS.
INT. DORZAK'S
QUARTERS

Special Req.
10-1 zoom
Standard transformation
White Mouse. Sc.48

L 48
(2 3/4 pages)
MAYA
DORZAK
TONY
GORILLA
Thu
4th
Nov.

EXTENDED
DAY

INT. MEDICAL CENTER

Special Req.
Practical TV Monitors
10-1 zoom

L 20: 22: 65: 68:
33: 35: 37: 39:

(7 1/2 pages)

HELENA
MAYA
TONY
ALAN
DR. VINCENT
YESTA
2 NURSES
SAHALA
Fri
5th
Nov.
INT. MEDICAL CENTER

Special Req.
Practical TV Monitors
10-1 zoom

L 41: 43: 44: 46:
49 pt.

(5 pages)

HELENA
MAYA
TONY
ALAN
SAHALA
MAYA/SAHALA
DORZAK
YESTA
DR. VINCENT
2 MEDICAL ATTDTS.
2nd SECURITY GUARD

2.
DATE SET STAGE SCENE NOS. CHARACTERS
Saturday, 6th November N O S H O O T I N G
Sunday, 7th November
Mon
8th
Nov.
INT. MEDICAL CENTER

Special Req.
10-1 zoom
Transformation Sc.49

L 49 comp. 70: 72

(2 1/2 pages)

HELENA: SAHALA
MAYA : ALAN
TONY: MAYA/SAHALA
DR. VINCENT
MAYA/DORZAK
2nd SECURITY GUARD
INT. TECH LAB.

Special Req.
Practical TV Monitors

L 47
(1 1/2 pages)
ALAN
ED MALCOLM
INT. DETENTION ROOM L 21 pt
(2 pages)
TONY
ALAN
SAHALA
Tue
9th
Nov.
EXTEN
DED
DAY
INT. DETENTION ROOM L 21 comp.
23: 29: 64

(4 pages)

TONY
ALAN
SAHALA
1st SECURITY
GUARD (L ) Sc.29
SECURITY GUARD
Sc.23
INT. DOCKING PORT NORTH
TUN-
NEL
30
(2 3/8 pages)
HELENA
MAYA
TONY
ALAN
SAHALA
1st SECURITY
GUARD (Sc.30)
2nd SECURITY
GUARD (Sc.30)
Wed
10th
Nov.
INT. DOCKING PORT NORTH
TUN-
NEL
31: 56: 58:
62:

(2 pages)

HELENA
MAYA
TONY
ALAN
SAHALA
1st SECURITY
GUARD (Sc.30)
2nd SECURITY
GUARD (Sc.30)
MAYA/SAHALA
DORZAK
2 SECURITY MEN
(Sc 58)
INT. CROTON SHIP

Special Req.
S.FX. Flash & fire
Fireman.
First Aid.

" 9 pt. 11 pt. 13 pt.
25: 28 pt.
24 (V.O)
(3 1/4 pages)
CLEA
SAHALA
YESTA
DORZAK
STUNT DBLE.
FOR YESTA
COMPUTER VOICE
Sc.25/28

3.
DATE SET STAGE SCENE NOS. CHARACTERS
Thu
11th
Nov.
INT. CROTON SHIP NORTH
TUN-
NEL
28 comp.
32

(6 1/2 pages)

HELENA
MAYA
DORZAK
ALAN
TONY
CLEA
SAHALA
YESTA
STUNT DBLE. YESTA
DR. VINCENT (VO)
2nd SECURITY GUARD
COMPUTER VOICE
Fri
12th
Nov.
INT. CROTON SHIP

Special Req.
10-1 zoom
Standard Trans-
formation Sc. 59

NORTH
TUN-
NEL
34: 36: 38:
40: 42: 45: 57:
59.

(6 1/2 pages)

MAYA
DORZAK
ALAN
TONY
2nd SECURITY GUARD
SAHALA
MAYA/SAHALA
HELENA V.O
Saturday, 13th November, 1976 N O S H O O T I N G
Sunday, 14th November, 1976
Mon
15th
Nov.
INT. CROTON SHIP NORTH
TUN-
NEL
61: 63:
67 pt.

(5 1/8 pages)

HELENA
MAYA
DORZAK
TONY
ALAN
SAHALA
2 SECURITY MEN
Tue
16th
Nov.
INT. CROTON SHIP

Special Req.
10-1 zoom
Standard Trans-
formation Sc. 69

NORTH
TUN-
NEL
67 comp.
69. 71

(2 1/2 pages)

HELENA
MAYA
DORZAK
ALAN
TONY
SAHALA
SPECIAL FX. SHOTS

1: 3: 5: 7: 9 comp. 11 comp. 13 comp. 14: 16: 24: 26: 27: 53: 55: 60.


Copyright Martin Willey